Plumbing, Insulation & Drywall
Construction Phase III: Interior Pex Plumbing Lines, Blown Cellulose Insulation and Installing Drywall. Plus a few photos of our wood-stove; Photos Nov - Dec 2007.
-
Pex Water Manifold for Greenhouse
-
Water Manifold with Pex Tubing
-
Pex Water Lines in the Ceiling
-
Hot and Cold Pex Lines for a Sink
-
Turning a Corner with Pex Lines
-
Tricky Spots Insulated by Hand Packing
-
Ready for Blown Cellulose Insulation
-
First Course of Blown Insulation
-
Wow! What a Mess
-
Hand Packing Insulation Where Needed
-
Cellulose Stays in Place Once Packed
-
Plastic Sheet Assisted Our Insulating Efforts
-
Ready to Insulate the Ceiling
-
Walls Insulated and Ready for Drywall
-
More Walls Ready for Drywall
-
Technique for Hand Packing Ceiling Insulation
-
Installing Drywall on the Ceiling
-
Hoisting the Drywall Onto the Ceiling
-
Using a Crutch to Support the Drywall
-
Securing the Drywall to the Ceiling
-
Installing the Wood-stove Chimney
-
Our Wood-stove Installed